
The Great Western Railway
The Great Western Railway (GWR) was a British railway company that connected London with the southwest and west of England, the West Midlands, and much of Wales. Established in 1833 and authorised by an Act of Parliament on 31 August 1835, it began running trains in 1838. The railway was engineered by Isambard Kingdom Brunel, who adopted a broad gauge of 7 ft (2,134 mm), later adjusted slightly to 7 ft 1/4 in (2,140 mm). From 1854 onward, a series of amalgamations led the company to operate 4 ft 8+1/2 in (1,435 mm) standard-gauge trains as well. The last broad-gauge services ran in 1892.
The GWR was the only company to retain its identity under the Railways Act 1921, which absorbed the remaining independent railways within its region. It remained in operation until the end of 1947, when it was nationalised and became the Western Region of British Railways.
Nicknamed by some as “God’s Wonderful Railway” and by others as the “Great Way Round”, the GWR became especially well known as the “Holiday Line”. It carried large numbers of travellers to resorts along the English and Bristol Channel coasts, and to destinations in the West Country and far southwest of England, including Torquay in Devon, Minehead in Somerset, and Newquay and St Ives in Cornwall. Many of the company’s locomotives were built at the company’s workshops at Swindon and were painted Brunswick green. Passenger coaches were typically turned out in the well-known chocolate-and-cream livery, while goods wagons were first painted red and later mid-grey.
Among the GWR’s best-known services were long-distance expresses such as the Flying Dutchman, the Cornish Riviera Express, and the Cheltenham Spa Express. It also operated a wide range of suburban and rural services, some using steam railmotors or autotrains. The company was innovative in freight operations too, introducing larger and more economical wagons than were common in Britain. Beyond rail, it ran a network of road motor (bus) routes, participated in Railway Air Services, and owned ships, docks, and hotels.
Origins of the Railway
The Great Western Railway grew out of the determination of Bristol merchants to preserve their city’s standing as Britain’s second port and principal gateway for trade with America. As ships became larger and the River Avon gradually silted up, Liverpool gained an advantage, especially with a Liverpool-to-London railway already under construction in the 1830s. To protect Bristol’s commercial future, local and London interests joined forces to build a railway of their own – one designed to a higher standard than any then being constructed towards the North West of England.
The company was formed at a public meeting in Bristol in 1833 and formally incorporated by Act of Parliament in 1835. Isambard Kingdom Brunel, then only twenty-nine years old, was appointed engineer.
Route of the Line
This was Brunel’s largest commission up to that point, and he made two highly controversial decisions. First, he chose a broad gauge of 7 ft (2,134 mm), believing that larger wheels mounted outside the carriage bodies would provide a smoother ride at higher speeds. Second, he selected a route north of the Marlborough Downs, avoiding major towns but allowing possible connections to Oxford and Gloucester. The consequence was that the railway did not follow the most direct line between London and Bristol. From Reading westward, it curved north before turning back towards Bath.
Brunel personally surveyed the entire route between London and Bristol, assisted by several people, including his solicitor Jeremiah Osborne of Bristol law firm Osborne Clarke, who on one occasion even rowed him along the River Avon so he could inspect the riverbank for the proposed route.
George Thomas Clark also played a significant engineering role, reportedly taking charge of two sections of the route, including the bridges over the River Thames at Lower Basildon and Moulsford, as well as Paddington Station. His involvement in large-scale earthworks appears to have inspired his later interest in geology and archaeology. He also anonymously wrote two guidebooks about the railway, one illustrated with lithographs by John Cooke Bourne, and another critical of Brunel’s methods and the broad gauge.
The first 22+1/2 miles (36 km) of the line, from Paddington in London to Maidenhead Bridge station, opened on 4 June 1838. Once Maidenhead Railway Bridge was complete, the line extended to Twyford on 1 July 1839 and then through the deep Sonning Cutting to Reading on 30 March 1840. Two years later, the cutting was the site of a serious railway disaster when a goods train struck a landslip, killing ten passengers travelling in open wagons.
This accident prompted Parliament to pass the 1844 Railway Regulation Act, requiring railway companies to provide better accommodation for passengers. The next section, from Reading to Steventon, crossed the Thames twice and opened on 1 June 1840. A further 7+1/4-mile (12 km) extension reached Faringdon Road on 20 July 1840. Meanwhile, construction had begun from the Bristol end, where the 11+1/2-mile (19 km) section to Bath opened on 31 August 1840.
On 17 December 1840, the London section reached a temporary terminus at Wootton Bassett Road, west of Swindon and 80.25 miles (129 km) from Paddington. The stretch onward to Chippenham opened on 31 May 1841, the same day as Swindon Junction station, where the Cheltenham and Great Western Union Railway (C&GWUR) connected to Cirencester. This was an independent line worked by the GWR, as was the Bristol and Exeter Railway (B&ER), whose first section from Bristol to Bridgwater opened on 14 June 1841. The GWR main line was still incomplete during construction of the 1-mile-1,452-yard (2.94 km) Box Tunnel, but once it opened on 30 June 1841, trains could run the full 152 miles (245 km) from Paddington to Bridgwater. In 1851, the GWR purchased the Kennet and Avon Canal, a competing route between London, Reading, Bath, and Bristol.
The GWR was closely associated with the C&GWUR, the B&ER, and several other broad-gauge railways. The South Devon Railway was completed in 1849, extending the broad gauge to Plymouth, from where the Cornwall Railway carried it over the Royal Albert Bridge into Cornwall in 1859. In 1867 it reached Penzance via the West Cornwall Railway, which had originally opened in 1852 with the 4 ft 8+1/2 in (1,435 mm) standard gauge, then commonly called “narrow gauge”. The South Wales Railway opened between Chepstow and Swansea in 1850 and was linked to the GWR by Brunel’s Chepstow Bridge in 1852. It was completed to Neyland in 1856, where a transatlantic port was established.
At first there was no direct line from London to Wales because the tidal River Severn was too wide to bridge easily. Trains instead had to travel via Gloucester, where the river was narrow enough for a crossing. Work on the Severn Tunnel began in 1873, but unexpected underwater springs delayed completion until 1886.
Brunel’s 7-foot Gauge and the “Gauge War”
Brunel devised his 7 ft (2,134 mm) gauge in 1835 and later added 1/4 inch (6.4 mm), probably to reduce friction on curves, producing the 7 ft 1/4 in (2,140 mm) broad gauge. Either version may be described as “Brunel’s” gauge.
In 1844, the broad-gauge Bristol and Gloucester Railway opened, but Gloucester was already served by the 4 ft 8+1/2 in (1,435 mm) standard gauge lines of the Birmingham and Gloucester Railway. This created a break of gauge, forcing passengers and goods travelling between the southwest and the North to change trains. This marked the beginning of the “gauge war” and led Parliament to appoint a Gauge Commission, which reported in 1846 in favour of standard gauge. As a result, Brunel’s 7-foot gauge was prohibited by law under the Regulating the Gauge of Railways Act, except in the southwest of England and Wales where it already connected with the GWR system.
Other British railways were therefore built to standard gauge. In 1846, the Bristol and Gloucester line was bought by the Midland Railway and converted to standard gauge in 1854, bringing mixed-gauge track to Temple Meads station – three rails that allowed both broad- and standard-gauge trains to use the same route.
The GWR pushed into the West Midlands in competition with the Midland and the London and North Western Railway. Birmingham was reached via Oxford in 1852, and Wolverhampton in 1854, the furthest north the broad gauge ever extended. In that same year, the Shrewsbury and Birmingham Railway and the Shrewsbury and Chester Railway both amalgamated with the GWR, although those lines were standard gauge, while the GWR’s own route north of Oxford had been built with mixed gauge.
This mixed-gauge network was extended south from Oxford to Basingstoke at the end of 1856, allowing through goods traffic from northern England to the south coast via the London and South Western Railway (LSWR) without transshipment.
The route to Basingstoke had originally been built by the Berks and Hants Railway as a broad-gauge line intended to keep the LSWR’s standard gauge out of Great Western territory. Yet in 1857, the GWR and LSWR opened a shared route to Weymouth on the south coast. The GWR approach ran via Chippenham and a route initially begun by the Wilts, Somerset and Weymouth Railway. Further west, the LSWR took control of the broad-gauge Exeter and Crediton Railway and North Devon Railway, as well as the standard-gauge Bodmin and Wadebridge Railway.
For several years these remote lines remained physically disconnected from the main LSWR network, so through traffic to them continued to be handled by the GWR and its associated companies.
By this stage the gauge war had effectively been lost, and mixed gauge reached Paddington in 1861, allowing through passenger trains from London to Chester. The broad-gauge South Wales Railway merged with the GWR in 1862, as did the West Midland Railway, which brought with it the Oxford, Worcester and Wolverhampton Railway, a line originally intended to be another broad-gauge route to the Midlands but eventually built as standard gauge after intense political and physical disputes.
On 1 April 1869, broad gauge was withdrawn between Oxford and Wolverhampton and from Reading to Basingstoke. In August of that year, the line from Grange Court to Hereford was converted from broad to standard gauge, and in May 1872 the entire route from Swindon through Gloucester to South Wales followed. In 1874, mixed gauge was extended along the main line to Chippenham, and the route from there to Weymouth was narrowed. The following year, mixed gauge was laid through the Box Tunnel, leaving broad gauge only for through services beyond Bristol and on a handful of branch lines.
The Bristol and Exeter Railway merged with the GWR on 1 January 1876. It had already begun the process of introducing mixed gauge on its line, and the GWR completed this through to Exeter on 1 March 1876. The station there had been shared with the LSWR since 1862. That rival continued to press westward over its Exeter and Crediton route and reached Plymouth later in 1876, prompting the South Devon Railway to merge with the Great Western as well. The Cornwall Railway remained nominally independent until 1889, although the GWR already held a substantial shareholding in it.
One final new broad-gauge route opened on 1 June 1877: the St Ives branch in western Cornwall. A small extension was also added at Sutton Harbour in Plymouth in 1879. Part of a mixed-gauge point still survives at Sutton Harbour, making it one of the very few examples of broad-gauge trackwork still in situ.
Once the GWR controlled the whole route from London to Penzance, it moved to convert the remaining broad-gauge tracks. The final broad-gauge service left Paddington on Friday, 20 May 1892; by the following Monday, trains from Penzance were running with standard-gauge locomotives.
Into the 20th Century
After 1892, freed from the burden of operating two gauges, the company focused on building new lines and improving old ones to shorten its previously indirect routes. Important new lines included:
- 1900: the Stert and Westbury, linking the Berks and Hants line with Westbury to create a shorter route to Weymouth for Channel Islands traffic.
- 1903: the South Wales and Bristol Direct Railway from Wootton Bassett Junction, providing a direct link with the Severn Tunnel.
- 1904: a diversion of the Cornish Main Line between Saltash and St Germans, removing the last wooden viaducts on the main line.
- 1906: the Langport and Castle Cary Railway, shortening the London to Penzance journey between Reading and Taunton.
- 1908: the Birmingham and North Warwickshire, which together with the Cheltenham and Honeybourne line of 1906 offered a new route from Birmingham via Stratford-upon-Avon to south Wales.
- 1910: the Birmingham Direct Line, built jointly with the Great Central Railway, giving a shorter route from London to Aynho and the North.
- 1913: the Swansea District Lines, enabling trains to Fishguard Harbour to avoid Swansea. Fishguard had been developed in an attempt to attract transatlantic liner traffic and offered better facilities for Anglo-Irish ferry services than Neyland.
Though generally seen as conservative, the GWR introduced a number of improvements before World War I, including restaurant cars, better accommodation for third-class passengers, steam heating, and faster express services. Many of these changes were driven by T. I. Allen, the Superintendent of the Line, and by a talented group of senior managers who led the railway into the Edwardian era: Viscount Emlyn (Earl Cawdor, chairman from 1895 to 1905), Sir Joseph Wilkinson (general manager from 1896 to 1903), his successor the former chief engineer Sir James Inglis, and George Jackson Churchward, the Chief Mechanical Engineer. It was also during this period that the GWR introduced road motor services as an alternative to building new rural branch lines, and began using steam rail motors to lower operating costs on existing branches.
One of the “Big Four”
In 1923, the first of 171 Castle Class locomotives was built.
When World War I broke out in 1914, the GWR – like most major railways in Britain – came under government control. Many staff joined the armed forces, and wartime conditions made it harder to build and maintain equipment. After the war, the government considered permanent nationalisation but instead chose compulsory amalgamation, grouping the railways into four large companies. The GWR alone kept its name through the “grouping” of 1922 and 1923.
The new Great Western Railway gained additional routes in Wales, including 295 miles (475 km) of former Cambrian Railways lines and 124 miles (200 km) from the Taff Vale Railway. It also absorbed a few independent English lines within its area, most notably the Midland and South Western Junction Railway. That line had previously worked closely with the Midland Railway, but now gave the GWR a second station at Swindon as well as a through route from the North via Cheltenham and Andover to Southampton.
The 1930s were difficult years, yet the company remained in relatively sound financial condition despite the Depression. The Development (Loans, Guarantees and Grants) Act 1929 enabled the GWR to secure funds in exchange for helping to stimulate employment. This money was used to improve stations such as London Paddington, Bristol Temple Meads, and Cardiff General; to upgrade depots; and to add tracks that reduced congestion. Its road motor services were transferred to local bus companies in which the GWR held shares, while the railway itself became involved in air services.
A legacy of the broad gauge was that trains on some routes could be built slightly wider than usual in Britain. This advantage was reflected in the 1929-built “Super Saloons“, used on boat train services carrying transatlantic passengers to London in luxury. When the company celebrated its centenary in 1935, new “Centenary” coaches were built for the Cornish Riviera Express, again taking advantage of the wider loading gauge available on that route.
World War II and After
With the outbreak of World War II in 1939, the GWR once again came under direct government control. By the end of the war, a Labour government was in office and was once more preparing to nationalise the railways. After a short and difficult recovery period, the GWR became the Western Region of British Railways on 1 January 1948. The Great Western Railway Company continued as a legal entity for almost two more years, before being formally wound up on 23 December 1949.
For a time, GWR-designed locomotives and rolling stock continued to be built, and the Western Region retained much of its distinctive identity, even repainting some stations and express trains in a version of the familiar chocolate-and-cream livery.
Around forty years after nationalisation, British Rail was privatised, and the old name reappeared through Great Western Trains, the train operating company responsible for passenger services on former GWR routes to South Wales and the South West. This company later became First Great Western as part of FirstGroup, before changing its name in September 2015 to Great Western Railway in order to “reinstate the ideals of our founder”. The infrastructure itself, however, passed to Railtrack and later to Network Rail, both of which have preserved significant parts of the old network’s stations and bridges, leaving many historic GWR structures still recognisable today.





